Latest News and Case Studies
For further information,
please call us on:
01474 879 858
 

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

News, Press and Case Studies

New Offices for a New Era

Accord Lift Services was conceived way back in 1983 and initially offered its services to larger lift company's; they were recognised for their skills in providing 'high level' technical support, particularly in fault resolution scenarios.

The support service quickly developed into a complete lift service aimed directly at clients of the lift industry; the business grew steadily, mainly through recommendation into one of the leading privately owned independent UK Lift Companies.

Their success in the market place attracted the attention of the CNIM Group, a major player in the fields of Transportation, Energy, Environment, Defence and Aerospace; the Paris based group acquired ownership of Accord Lift Services in June 2006.

Accord continued to develop under their new French owner's right up until February 2010, when they were acquired by the 'well respected' Schindler Group.

Schindler quickly recognised the fact that further investment in Accord would really accelerate the company to the highest echelons of the UK Independent sector; they decided to start by commissioning the complete refurbishment of the office building in Ash, near Sevenoaks in Kent.

Click here to view article in E-levation Magazine

 

 

Beacon Award

Accord Lifts were presented with the 'Beacon Award' by Tube Lines at Kennington Underground Station for sustained high-level of compliant Health & Safety.

9th September 2009

 

 

‘All change at the Borough’

Building managers, Consultants, Architects, Builders and their clients need complete faith in the abilities of their preferred lift service supplier.

Our previous track record supplying quality bespoke solutions to a wide range of clients, highlighted our capabilities to Tube Lines who were looking for a supplier that could deliver a design solution to problems they were experiencing at an existing site.

Our performance on that project secured our place on the Tender invitation list for both Borough and Kennington stations.

Accord are proud to have been the lift contractor of choice on this pioneering project refurbishing PMVT at Borough Station.

This was an extremely challenging assignment in terms of design, involving the integration of new technology with existing equipment.

Utilising our industry leading expertise, we were able to ensure the station remained operational whilst the works were being carried out, minimising disruption to passengers.

Accord Lift Services employs some of the most experienced engineers in the country. People who care about their customers and always provide a professional service and attention to detail.  Our approach and commitment to projects such as the Borough ensures that we continue to remain at the forefront of the lift industry.

Click here to view article in Platform Magazine

 

'A Lift fit for a King'

King’s College London is one of the top 25 universities in the world (Times Higher Education 2008) and the fourth oldest in England. A research-led university based in the heart of London, King’s has 21,000 students from more than 140 countries, and 5,700 employees. King’s has an outstanding reputation for providing world-class teaching and cutting-edge research. The College is in the top group of UK universities for research earnings and has an annual income of approximately £400 million.

King’s has a particularly distinguished reputation in the humanities, law, the sciences (including a wide range of health areas such as psychiatry, medicine and dentistry) and social sciences including international affairs. It has played a major role in many of the advances that have shaped modern life, such as the discovery of the structure of DNA. It is the largest centre for the education of healthcare professionals in Europe and is home to five Medical Research Council Centres – more than any other university.

King’s is in the second phase of a £1 billion redevelopment programme which is transforming its estate.

Having recently completed a lift replacement project at the Strand Campus, Accord Lifts are proud to be associated with the redevelopment of such a prestigious establishment.

Click here to view article in E-levation Magazine

 

New Branch Office for Accord

Accord Lift Services Limited is delighted to announce the opening of a Northern Regional office in Oldham.

The new branch office will be managed by John Cawley, who previously worked for ThyssenKrupp Elevator and is well versed in the Operations and Sales aspect of our industry. John will be responsible for the provision of planned and reactive maintenance services, repairs, modernisations and new installations.

Managing Director, Liam Raftery said: “The new Branch Office is in an excellent location, just 15 minutes drive from Manchester City Centre and just off Junction 21 of the M60, giving easy access to the entire regional motorway network.

I believe that our presence in this area will enable us to continue the company’s stated objectives of supplying a prompt, professional and efficient service to our Clients.”

Contact details are as follows: Accord Lift Services Ltd, Howarth Court, Broadway Business Park, Oldham, OL9 9XB. Tel: 0161 8702722 Fax: 0161 6833290.

 

Click here to view article Theatre Patrons Given A Lift

 
 

Staff News

22nd March 2010 - Apprenticeship Completed
7th October 2009 - Congratulations
28th July 2009 - Congratulations

 

 
 
 
 
© Accord Lift Services Ltd, 2009
Site by Wizbit